Planning a new roof

How to prepare your home for a roof replacement

Clear space inside and out, make room for scaffolding, deliveries and waste, and talk to your roofer and neighbours before work starts. A little preparation protects your belongings and helps the job run smoothly.

By Severnside Roofing · Published · Revised

A new roof is a big project, and a little planning on your side can reduce disruption. Use this checklist in the weeks before work begins.

Inside the house

  • Move furniture and belongings away from the walls in rooms directly below the roof.
  • Take valuable items and artwork somewhere safe, or cover them well with dust sheets.
  • Cover or move anything stored in the loft, as dust and debris can fall into it while the old roof is stripped.

Outside

  • Move garden furniture, barbecues, plant pots and anything else that could be damaged by falling debris or materials.
  • Have overhanging branches cut back if they’ll get in the way of the work. Use a tree surgeon for anything high up or near cables rather than climbing a ladder yourself.
  • Clear paths around the house so the team can reach every side of the roof from the ground.
Perimeter scaffold around a hipped tiled roof during roofing work
Perimeter scaffold around a hipped tiled roof during roofing work

Access, parking and neighbours

  • Keep the driveway clear for vehicles delivering materials and equipment.
  • Agree with your roofer where their vehicles will park and where materials and waste will go.
  • Let your neighbours know when work is starting, especially if parking or noise might affect them.

Tell your roofer about

  • Any cables, wiring or pipes near the roofline, and anything fixed to the roof such as a TV aerial or satellite dish.
  • Times when getting in and out of the house might be difficult.
  • Pets, and how you’ll keep them safe and settled during the work.
  • Any other building work you have planned. It can make sense to do the roof first so other trades have easier access afterwards.

Weather and timing

Heavy rain or strong winds can hold up roofing work. Be prepared for the finish date to move and ask your roofer how the roof will be kept watertight if work has to pause.

Permissions and waste

Re-roofing may need Building Regulations approval, and listed buildings or homes in conservation areas may need other consents. Ask your roofer what applies and who will arrange it before work starts. Agree how waste will be removed, too.

Still choosing a roofer? Read how to choose a qualified roofing contractor and our questions to ask before work starts. For what the job itself involves, see re-roofing and domestic scaffolding.

Before you decide

More questions about your project

What should be agreed if hidden defects change the job?

Agree how findings, additional cost and programme implications will be communicated before the covering is opened.

Read more: What should be agreed if hidden defects change the job?

Related services

Planning a new roof?

Request a quote or call us to talk through your project and timings.

Call 01952 279451

WhatsApp 07397 554832

Request a quote

Takes about two minutes. Fields marked optional can be left blank.

How should we reply?

Give us at least one way to reach you.

What do you need?

For example: a leak over the back bedroom, or a full re-roof on a three-bed semi.

We use your details only to reply to this enquiry. See our privacy policy. Prefer to send photos? Use WhatsApp 07397 554832.

You can change these at any time from “Cookie settings” at the bottom of every page. See our cookie policy.

Essential

Needed for the site, security and sending enquiries. Always on.

Analytics

Helps us see which pages are useful.

Advertising

Measures whether our ads lead to enquiries.